KARACHI: K-Electric Limited (KE), the power generating and supply company, on Thursday announced massive 161 per cent growth in net profit for quarter ended September 30, 2021, mainly surge in revenue in the shape of tariff adjustment.
The profit after tax of the KE grew by 161 per cent to Rs2.9 billion for the quarter ended September 30, 2021 as compared with Rs1.11 billion in the same quarter of the last year.
The company announced Rs0.11 as earnings per share (EPS) for the quarter under review as compared with Rs0.04.
The revenue of KE exhibited sharp growth of 33 per cent to Rs114.14 billion for the quarter ended September 30, 2021 as compared with Rs85.55 billion in the same quarter of the last year.
The sales of energy grew by 27 per cent to Rs86.92 billion for the quarter under review as compared with Rs68.40 billion in the same quarter of the last year.
In the head of tariff adjustment, the revenue of the company recorded 58.72 per cent increase to Rs27.22 billion for the quarter ended September 30, 2021 as compared with Rs17.15 billion in the same quarter of the last year.
Cost of sale grew by 36 per cent to Rs97.49 billion as against Rs71.68 billion.
Operating expenses of KE recorded a significant increase to Rs1.81 billion for the quarter ended September 30, 2021 as compared with Rs338 million in the same quarter of the last year.
KARACHI: Pakistan State Oil (PSO) on Thursday announced a massive jump in its quarterly net profit by over 120 per cent for the period ended September 30, 2021.
According to consolidated results, the profit of the company surged to Rs11.53 billion for the quarter ended September 30, 2021, as compared with Rs5.22 billion in the same quarter of the last year.
PSO announced Rs24.93 as earning per share for the quarter ended September 30, 2021 as compared with Rs11.07 in the same quarter of the last year.
The company in its board of management meeting held on October 28, 2021 approved the results and recommended no dividend for the period.
The company posted a gross profit of Rs 22.1 billion with gross margins set at 4.80 per cent in the first quarter of 2021/2022 compared to gross profit of Rs 11.5 billion (4.09 per cent gross margins) in the prior year.
Analysts view noteworthy changes in ex-refinery prices that resulted in inventory gains of around Rs 7 billion in 1QFY22 compared to inventory gains of Rs 1.5 billion in same period last year.
Other operating income decreased by 87 per cent QoQ to Rs 1,786 million in 1QFY22. We believe, absence of Late Payment Surcharge (LPS) resulted in decline in other income.
Meanwhile, finance costs nosedived by 92 per cent QoQ and 27 per cent YoY to Rs 626mn which is owing to lower reliance on short term borrowings and lower interest rates, we view.
The company recorded effective taxation at 32.6 per cent in 1QFY22 compared to 33.0 per cent in 1QFY21.
KARACHI: Pakistan Petroleum Limited (PPL) has announced 18 per cent growth in net profit of the first quarter ended September 30, 2021.
The company announced profit after tax of Rs16.86 billion during the first quarter (July – September) of the current fiscal year as compared with Rs14.32 billion in the corresponding period of the last fiscal year.
PPL announced earnings per share at Rs6.2 for the quarter under review as compared with Rs5.26 EPS in the same quarter of the last year.
The board of directors of the company at its meeting held on Monday approved the unconsolidated and consolidated financial statements for the first quarter ended September 30, 2021.
The company declared revenue growth to Rs43.59 billion during the first quarter of the current fiscal year as compared with Rs39.32 billion in the same quarter of the last fiscal year.
Operating expenses of the company also grew to Rs10.43 billion as compared with Rs9.4 billion.
Under the head of royalties and other levies, the company paid an amount of Rs6.43 billion during the first quarter of the current fiscal year as compared with Rs5.95 billion in the same period of the last year.
The exploration expenses of the company increased to Rs4.86 billion during the quarter of July – September 2021 as compared with 2.29 billion in the same period of the last year.
KARACHI: Engro Corporation Limited has posted a significant 23 per cent growth in consolidated revenue for the nine-month period ended on September 30, 2021.
Pakistan’s premier conglomerate, Engro Corporation (PSX: ENGRO) announced its financial results for the third quarter ended September 30, 2021.
Engro delivered a strong operational performance in first nine months of 2021 as its consolidated revenue grew by 23 per cent from Rs 182,497 million as compared with Rs223,581 million in the corresponding period of the last year.
The company recorded a consolidated Profit After Tax (PAT) of Rs40,504 million up by 31 per cent from same period last year.
Profit attributable to the owners stood at Rs23,173 million compared to Rs18,345 million in the first nine months of 2020, resulting in an Earnings per Share (EPS) of Rs40.22 compared to Rs31.84 in the nine months of 2020. The growth in the bottom line is primarily attributable to increased profits posted by Fertilizers and Petrochemicals businesses.
On a standalone basis, the Company posted a PAT of Rs 16,015 million against Rs 9,283 million in 9M 2020, translating into an EPS of Rs 27.80 per share. The Company also announced an interim cash dividend of Rs 5 per share for third quarter taking the total dividend distributed for the year to Rs 24 per share.
Financial Performance – Segmental Perspective:
Fertilizers: Domestic market witnessed strong agricultural sector performance in 2021 with limited impact from COVID-19 led lockdowns. Prices of agri commodities remained firm during the quarter resulting in improved earnings for farmers and higher urea industry volumes versus prior year.
Engro Fertilizers Limited (“EFert”) revenue during the period stood at Rs 92,742 million versus 78,138 million on the back of higher Urea sales of 1,644 KT in comparison to 1,451 KT in 9M 2020. Urea production stood 1,560 KT versus 1,694 KT in 9M 2020 on account of planned plant turnarounds. EFert recorded Phosphate sales of 242 KT against 366 KT in 9M 2020. As a result, the PAT for EFert stood at Rs 14,921 million for 9M 2021 as compared to Rs 11,491 million in the same period last year.
Petrochemicals: International PVC prices reached an all-time high of $1850/MT by September end due to high demand along with global supply disruptions. Domestic PVC market recorded a volumetric increase of 30 per cent in Q3 2021 against previous quarter as buying sentiment improved.
Engro Polymers and Chemicals Limited (“EPCL”) announced commercial operations of the new PVC plant on March 01, 2021, increasing the capacity by 100 KT to 295 KT per annum and commercial operations of 50 KT new VCM DBN capacity on June 25, 2021 increasing capacity to 245 KT per annum.
In 9M 2021, EPCL recorded a revenue of Rs 49,323 million as compared to Rs 22,931 million in in 9M 2020. The business witnessed its highest ever profit of Rs 10,372 million versus Rs 2,103 million on account of increased volumetric sales, efficient operations and higher international prices.
Connectivity: Engro continued to expand its footprint through Engro Enfrashare which has now become the country’s largest Independent TowerCo (with 48 per cent market share vs 41 per cent in 2020) in terms of operational sites, serving all Mobile Network Operators in Pakistan. As at September 30, 2021, Enfrashare held a portfolio size of 2,030 operational sites and 2,219 tenancies resulting in a tenancy ratio of 1.09x.
The telecom sector in Pakistan is registering an annual growth of 28 per cent with the 3G / 4G subscriber base expanding beyond 100 million. This has led Engro to enhance its total equity investment in the Telecom Infrastructure vertical to Rs 21.5 billion. Engro has also formed a dedicated platform for connectivity and telecom infrastructure related initiatives by the name of Engro Connect (Pvt.) Limited. Engro Connect is a wholly owned subsidiary of Engro and will hold complete ownership of Engro Enfrashare (Pvt.) Limited.
Energy & Power: Sindh Engro Coal Mining Company (“SECMC”) supplied around 3 million tons of coal to Engro Powergen Thar Limited (“EPTL”) during the period. SECMC’s expansion work to enhance its output to 7.6 million tons per annum is in progress. EPTL remained fully operational and achieved 84.7 per cent availability with a load factor of 82 per cent, dispatching 3,253 GwH to the national grid during the period.
Engro Powergen Qadirpur Limited (“EPQL”) operates on permeate gas and is currently facing gas curtailment from the Qadirpur gas field as it continues to deplete. To make up for this shortfall, EPQL’s plant has been made available on mixed mode. The plant dispatched a net electrical output of 615 GwH to the national grid with a load factor of 44 per cent compared to 32 per cent during the same period last year. EPQL posted a PAT of Rs 1,463 million for the current period as compared to Rs 2,031 million for 9M 2020, which is mainly attributable to retirement of debt component.
Terminals: Profitability of both the LNG and chemicals terminal remained healthy during the period. The chemicals terminal throughput volumes normalized to 934 KT versus 806 KT last year as volumes were impacted in 2020 due to lockdowns because of COVID-19. The LNG terminal handled 52 cargoes against 54 cargoes during same period last year, delivering 158 bcf re-gasified LNG in to the SSGC network.
With around two years of planning and efforts amidst COVID-19 volatility, Engro Elengy Terminal Limited (“EETL”) has successfully completed Pakistan’s first-ever dry docking activity at Qatar dockyard. During the dry docking period, FSRU Sequoia enabled gas supply continuity ensuring national energy security. After completion of its dry docking, FSRU Exquisite has now returned to Pakistan and is online.
KARACHI: Bestway Cement Limited announced on Friday its plans to significantly expand its production and energy capabilities with the establishment of a Brownfield cement plant and a 6.4 MW off-grid solar power plant.
In a communication shared with Pakistan Stock Exchange (PSX) and London Stock Exchange, the company said that OGDCL, being operator of Jandran West Exploration License with 100 per cent interest, had made a gas discovery over Mughalkot Formation from its exploratory efforts at Jandran West X-1 well which is located in Kohlu District, Balochsitan, Province, Pakistsan.
Jandran West X-1 well was spudded-in on May 19 2021 as an exploratory well and drilled down to a total depth of 1627m into Parh Formation. Based on the good gas shown during drilling, interpretation of open hole logs data, Drill Stem Test (DST) has been performed in Mughalkot Formation.
The well flowed at the rate of 2.391 Million Standard Cubic Feet per Day (MMSCFD) gas with traces of condensate at WellHead Flowing Pressure (WHFP) of 455 Pounds per Square Inch (PSI) at 32/64” choke size.
OGDCL being the leading exploration and Production Company in Pakistan has adopted aggressive exploration strategy which has resulted into Hydrocarbons discovery over Jandran West X-1. This discovery will add to the hydrocarbon reserve base of OGDCL and the of the country.
This is a continuation of an earlier arrangement between ITMinds and PPL through which ITMinds had been successfully providing these BPO services to PPL, a statement said on Monday.
Through this arrangement, ITMinds will facilitate PPL for the accounting and administration of PPL’s Retirement Funds, including Pension, Provident and Gratuity funds, allowing PPL to focus on its investment decisions by leveraging ITMinds’ state of the art back office system and IT infrastructure while reaping the benefits of economies of scale.
Commenting on the occasion, Syed Rahat Hussain Naqvi, Senior Manager Finance-PPL, emphasized the importance of automation of back-office services for retirement funds for both process improvement as well as cost optimisation. He further appreciated how this arrangement with ITMinds in the last three years has helped to provide uninterrupted services, especially during the pandemic induced circumstances.
Also commenting on the occasion, Iqleem-uz-Zaman Khan, CEO – ITMinds, said that considering this is an era of specialization, ITMinds’ BPO services of fund accounting and administration enable companies to outsource their back office functions to a competent and reliable BPO partner while achieving efficiency, scalability and transparency of processes.
The event was also attended by, Shariq Jafrani CFO-CDC, Waqas Ashraf CFO- ITMinds, Muneer Hussain Manager Shared Services-PPL, M. Tarique Sheikh Senior Accountant-PPL and Salman Iqbal, Manager- ITMinds.
ISLAMABAD: The government on Saturday increased the price of petrol to a record high at Rs137.79 per liter. The government announced to increase prices of all petroleum products with effect from October 15, 2021.
The price of petrol has been increased by Rs10.49 to Rs137.79 from Rs127.30 per liter. The price of High Speed Diesel (HSD) has been increased by Rs12.44 to Rs134.48 from Rs122.04 per liter. The price of kerosene oil has been enhanced by Rs10.95 to Rs110.26 from Rs99.31 per liter. Similarly, the price of light diesel oil has been increased by Rs8.48 to Rs108.35 from Rs99.51 per liter.
A notification issued by the Finance Division said at present, oil prices have risen around $85 a barrel, which is the highest since October 2018.
Importantly, entire energy chain prices have witnessed a strong surge in the past couple of months due to higher demand for energy inputs and supply bottlenecks.
In the current scenario, the government has absorbed the pressure and provided maximum relief to the consumers by keeping petroleum levy and sales tax to a minimum level. Therefore, prices worked out by OGRA have been approved, according to the statement.
KARACHI: The State Bank of Pakistan (SBP) has relaxed financing conditions to promote investment in renewable energy solutions by companies.
The SBP in a statement on Monday said that it had softened the conditions for renewable energy solution providers under its Refinance Scheme for Renewable Energy.
Now, all Renewable Energy Investment Entities (RE-IEs) interested in installing renewable energy projects/solutions are allowed to avail refinance under category III of the scheme.
An RE-IE is a business entity (including vendors and suppliers) whose business is to establish renewable energy projects for onward leasing/renting out/selling on deferred payment basis or selling of electricity generated from these projects to end users.
It may be recalled that with an aim to help address the challenges of energy shortages and climate change, SBP revised its SBP Financing Scheme for Renewable Energy in July 2019.
SBP also launched a Shariah complaint version of the scheme in August 2019. The scheme now comprises of three categories. Under Category I, financing is allowed for setting up of renewable energy power projects with capacity ranging from 1 MW to 50 MW for own use or selling of electricity to the national grid or a combination of both.
Under Category II, financing is allowedto domestic, agriculture, commercial and industrial borrowers for installation of renewable energy based projects/solutions of up-to 1 MW to generate electricity for own use or selling to the grid/distribution company under net metering.
Under Category III, financing isallowed to vendors/suppliers/energy sale companies for installation of wind and solar systems/solutions of up to 5 MW. Since the inception of the scheme,717 projects having potential of adding 1,082 MW of energy supply through renewable sources have been financed. As of June 30, 2021, total outstanding financing under the Scheme is Rs53billion. While there is substantial take up under Category I & II, solution suppliers under Category III faced problems.
Accordingly, in light of the feedback received from stakeholders including renewable energy solution suppliers, Alternate Energy Development Board, NEPRA and banks, the requirement of AEDB certification has been relaxed for RE-IEs who do not undertake installations on their own but hire services of installers/vendors for installation of RE projects/solutions.
However, vendors/ suppliers/engineering procurement & construction (EPC) contractors of these RE-IE will still be required to be certified under AEDB certification regulations. It is expected that this revision in category III will further facilitate in production of clean energy.
In a move aimed at providing relief to consumers, the federal government has announced a reduction in the sales tax rates on the supply of petrol and high-speed diesel (HSD).